1. out of control approaching the bottom mark. i was on the same lap as the scows.
2. at least i missed them.well I finised two races, and in one of them i beat another boat.
Had a couple of teething problems as you do when your that unprepared at a regatta.
Saturday was a bit of a write-off, as it was squalling through at 20-30kts as predicted. there was one boat in a fleet of 11 which did not sustain any damage, and that was Matt with his bladerider. He sailed the boat pretty damn well for the conditions. The sheer variety of damage seen on the rigging lawn after racing was abandoned was impressive even for a moth regatta. I lost my rig, and in the process busted a panel in my pretty shagged sail. (fixed with gaffa tape) The foils were fine, but they were probably to blame for the whole 'losing the rig' caper in the first place.
I have somehow managed to stuff up the angle of atack of the centreboard, i think. There isn't enough +ve angle, which meant i wasn't getting up and foiling at the kind of low speeds i should be able to. I will fix it by increasing its forward rake, which in the long run isn't a bad thing. This means i need to modify my centreboard case thing.
The rudder adjustment systems is shit. needs a better sollution.
Both ball joints failed on saturday, and though i tried to fix them with 5 minute epoxy, they were too loaded up and snapped again within minutes. So i sailed Sunday with no flaps at all, and it was predictably hard to foil and hairy once up. I have a new 'bladerider inspired' sollution, which should work or at least look a bit pro. Means ill have to go back to stainless rod for pushrods instead of fibreglass. no big deal.
Anyway, for the next month or so I've got a bit on at uni, probably not much will happen on the boat. After that ill sort out a new mast and sail, and get to work on the few things to tune before i go sailing agian.











Now for the gantry. The QLD moth states and my deadline are fast approaching (we're inside a week) The gantry should take 3 or 4 days to put together so i may even be able to rig the boat before the regatta. ha! as if. I bought a vacuum pump off ebay today for $160 bucks, which i think was an ok buy, and its in brisbane too so ill pick it up tomorrow, get some tacky tape on monday and be sucking on monday night. in the mean time i need a jig to get the angles of the tubes right and get them glued/carboned together.



The oven sat on 75-80 degrees for 24 hours, last time it was summer and it all got a bit hotter, more like a solid 80-85. and the resin loves that, so consequently i haven't got the tesnile strength in the resin quite as good. and it has a different, dull pitch when you knock it. but its still ok. that coupled with the better lay-up and a couple of other dirty tricks i have up my sleeve (rubs hands together) should hopefully make this one not break. 

